CHADDS FORD TOWNSHIP SEWER AUTHORITY
MINUTES
June 17, 2003
The 166th meeting
of the Chadds Ford Township Sewer Authority was held on this date in the Chadds
Ford Township building.
Present: James J. Murray,
Chairman, John Spoehr, Vice Chairman, Paul Linsen, Secretary, Garry Paul,
Treasurer, and Vincent Del Rossi. Also
in attendance were John J. Mezzanotte, Jr., Esquire, Solicitor, Angelika B.
Forndran, P.E., Engineer, James C. Kelly,
P.E., CFT Engineer and Sabina J. Taylor, Secretary/Treasurer.
The meeting was called to
order at 7:00 p.m. by James Murray, Chairman
ANNOUNCEMENTS:
•
The Sewer Authority is seeking the assistance
of Senator Dominic F. Pileggi and Representative Stephen Barrar to help with
the excessive charges due to PennDOT requirements unrelated to the original
design for the Ridge Road Project.
These costs amount to $29,795.
Senator Pileggi’s office has responded to the Authority’s request to
look into the matter. Residents will be
kept informed of any progress made.
•
May 21, 2003 -
Two members of the Sewer Authority met with representatives of the Brandywine
Conservancy to discuss matters of general interest regarding sewers.
•
May 29, 2003 -
The Chairman, Treasurer and Secretary/Treasurer met with a representative of
the Chadds Ford Township Board of Supervisors to discuss aged loans from the
Township to the Sewer Authority.
•
A public
meeting will be scheduled to review the status of the DVRFA loan. Chairman Murray said he would like to
schedule this meeting sometime in August, either at the regularly scheduled SA
meeting or at a special meeting.
PUBLIC
COMMENT:
None.
MINUTES:
There
being no changes, the minutes of the May 13, 2003 CFTSA meeting were
unanimously approved on a motion duly made and seconded (Paul/Del Rossi).
TREASURER’S
REPORT:
The Treasurer’s Report was read. Account balances were reported as follows:
General
Fund Account
Beginning Balance $30,473.67
Receipts
13,439.15
Balance $43,912.82
PLGIT/Plus
Account - Tapping Fee Account
Beginning Balance $367,548.96
Receipts
0.00
Balance $367,548.96
Ridings
Operating Account - First Union
Beginning Balance
$1,000.00
Receipts
1,484.70
Balance $5,484.70
PLGIT
Account - ROA
Beginning Balance $34,799.36
Transfer from First Union ROA 1,484.70
Dividends
31.76
Balance $36,315.82
Disciascio
Escrow Account
Beginning Balance
$15,163.21
Interest
28.44
Balance $15,191.65
Mr. Linsen asked a question regarding the Disciascio
Escrow Account. Chairman Murray gave a brief
history of how and why this account was established. It was explained that once those holding extra capacity offer
that capacity for sale, there would be capacity available for purchase.
ACCOUNTS RECEIVABLE:
<
Chairman Murray
asked about the status of the outstanding invoice sent to the Brandywine
Conservancy. He said the Conservancy
was invoiced for work done by the Sewer Authority engineer relating to the new
holding tanks. Mrs. Taylor said copies
of the SSM invoices were included in the billing sent to the Conservancy. Mr. Mezzanotte will follow up on this.
<
Mrs. Taylor
said 3rd quarter invoices to all Residential and Nonresidential
customers were mailed out yesterday.
In response to a question regarding billing those customers in the Raven
Crest Phase 1 area who had not yet connected to the available system, it was
noted that it is not fair to those property owners who did connect in a timely
manner for those who have not connected, to not be billed. On a motion made by Paul Linsen and seconded
by John Spoehr, the Board members unanimously agreed that Mrs. Taylor is to
invoice all property owners where connection to the system is available whether
or not they have connected.
<
Responding to a
question relating to invoicing the Brandywine Summit Nonresidential properties,
Mrs. Taylor explained that although these three properties are not yet
connected she has been sending the owners invoices for the held EDUs but not
the usage charge. Mr. Mezzanotte said
as part of the overall agreement and understanding with those users, to prompt
their earliest possible connection, the Authority had indicated there might be
some forbearance on collection of a portion of that fee. They responded positively and the only
reason that they are not connected is that the Authority is having difficulties
with the manhole in which they would connect.
Mr.
Linsen asked the status of the manhole problem. Chairman Murray indicated that
the contractor did a very poor job on the construction
of the manhole and the engineer supervising the project indicated, by record,
that the job was tested and it obviously wasn’t. He further explained that he and Mr. Mezzanotte are working with
the contractor to get the problem resolved.
If an agreement can not be reached, the next step is contacting the
contractor’s bonding agency.
ACCOUNTS PAYABLE:
GENERAL FUND - General Fund Account invoices totaling $10,024.98 were presented for
payment. After discussion relating to
the engineer’s invoices, the Chairman suggested that the invoice for consulting
service for budget and sewer rate calculations at a cost of $2,992
be broken out as a separate item.
It was agreed that the check for this work would be included in the
amount approved for payment, but is to be held until a separate invoice is
received. A motion was made and seconded (Del Rossi/Murray) to approve payment
of the invoices to be paid from the General Fund in the amount of $10,024.98. The motion passed unanimously.
RIDINGS OPERATING ACCOUNT - Invoices
totaling $14,382.35 presented for payment from the Ridings Operating Account
were unanimously approved for payment on a motion by Garry Paul, seconded by
Vince Del Rossi.
Mr. Paul and Mr. Del Rossi asked that they receive
copies of the current American Water Services Operation and Maintenance
Contract for the Ridings Plant. They
would like time to review the current contract which is in effect until
December 1, 2003.
SOLICITOR’S REPORT:
Mr. Mezzanotte gave comments on:
1.
CCMC Manhole
2-9 - A background of the
problems with this manhole was given by Mr. Mezzanotte. He explained how the problem was discovered
and investigation revealed that the manhole has been constructed improperly. First, not in accordance with what was
anticipated to have been included in the plans and secondly, even though there
were deviations from the plans, those deviations were very poorly
executed. Notification followed to both
the contractor and engineer for the project.
After a meeting with the contractor and project engineer, the contractor
submitted a proposal for repairing the manhole. Authority Engineer, Ms. Forndran consulted with a representative
of the company that manufactures the special type of grouting that the
contractor proposed to use. She then
advised the Authority that the contractor’s proposal was in order, but the
proposal should state that the grout application must be done consistent with
the manufacturer’s recommendations. It
was also noted that the Authority would need a guarantee of that work by the
contractor, and the Authority expects to be reimbursed for expenses of
approximately $5,000 incurred in searching for, discovering and temporarily
stemming the I & I resulting from the incorrectly constructed manhole.
Mr. Mezzanotte suggested the members, in responding to
the contractor’s proposal, consider a 1 year guarantee of the contractor’s
work, at least $2,500 toward the costs incurred by the Authority, and giving
the contractor 48 hours to agree to these terms. If the contractor does not agree, the Authority would then make
an application to the contractor’s bonding company and proceed to have the
repairs done by another contractor. He
also suggested that the Authority seek to recover the remaining $2,500 of costs
incurred from the project engineer.
Discussion
followed regarding the Authority’s options in accepting the proposal
and the terms to be included. Ms. Forndran noted that, if the material to
be used to repair the manhole is properly applied, it should hold for a minimum
of 5 years.
After further review of Mr. Mezzanotte’s suggestions, the members agreed to accept the contractor’s proposal for repairs,
which would automatically include a 1 year guarantee under the original project
contract. The Authority also will
expect the contractor to pay the $2,500 and to respond to these terms within 48
hours. It was agreed to contact the
project engineer regarding payment of the other $2,500 in costs.
2.
Monjovi- Dr. Monjovi is considering purchasing the
Disciascio property and inquired about the transfer of the currently leased
EDU. After discussion, the Authority
members agreed that, if the Disciascio property is sold, there would not be a
problem in the assignment of the leased EDU to the new owner.
3.
Debt - There has been an inquiry from the Township
regarding an outstanding debt owed to the Township by the Sewer Authority. A meeting was held to address this matter
with Mrs. D’Elia.
4.
Lawrie
Property - An attorney
representing a prospective purchaser of this property has contacted Mr.
Mezzanotte and indicated that there may be some residential development of this
property. The attorney also noted
there has been discussion with Mr. Grace about the possible purchase of
capacity for this property.
5.
Barnaby’s
Property - Mr. Yannacone,
who represents the purchaser of this property has been reminded that in the
Authority’s view the transfer of capacity to the new owner has not been
completed because there has not been an Assignment of Capacity executed.
6.
Lien and
Forbearance Agreement -
Three of the four property owners being considered for this program have not
responded despite a follow up telephone call to each from Mrs. Taylor. Mr. Mezzanotte has sent these property
owners a letter indicating that it is time for them to fulfill the Lien and
Forbearance Program requirements or formal action will follow.
ENGINEERS REPORT:
Ms. Forndran reviewed her written report:
1.
RRE -
•
Final walk
through was done on June 4, 2002. Four
minor items remain on the punch list.
•
Ms. Forndran presented two copies of the record
plan to the Sewer Authority and a copy to the Township for Mr. Jensen’s
files.
•
Reviewed the status of paper work including the
maintenance bond.
2.
St.
Cornelius Elementary School Connection -
•
Reviews with Engineer and Mr. Jensen completed.
•
Final item is installation of pumps and control
panel for elementary school.
3.
Inflow and
Infiltration -
•
Submitted repair recommendations for Manhole
2-9. Repair work to be scheduled.
4.
Developers
Reviews -
•
Enzo’s - Reviewed planning
module submission for Authority reply to DEP with respect to capacity; need
plans for review.
•
Tremonte - Reviewed submitted plans. Some comments have been forwarded to the
engineer, more to follow. A letter will
be sent to DEP regarding the minor Act 537 revision being done for this area.
5.
Annual WWTP
Inspections -
•
Inspections have been completed and the reports
submitted to the Authority for transmittal to owners.
•
Some improvements regarding safety issues have
been done at the Pantos plant.
6.
Ridings
Wastewater Plant -
•
I & I has improved and flows are getting back
to expected average flows.
•
There are a few items to be discussed with the
operator regarding the proposal for inhibiting filamentous bacteria growth and
a few items that were raised in the inspection report.
Chairman Murray noted that the Authority has spent
about $20,000 so far this year on I & I and we have to watch the
budget. He said that American Water
Services has assigned a new operator to the Ridings Plant.
Mr. Paul and Mr. Del Rossi are reviewing the Ridings
Plant operation information and the current Operation and Maintenance Contract
in preparation for a new contract for 2004.
Chairman Murray asked Ms. Forndran for some input also.
•
By July 15 an I & I corrective action plan
report is due to DEP.
OTHER MATTERS:
•
Ms. Forndran said there should be an initial
flow meter reading at St. Cornelius elementary school as soon as the connection
is made. The daycare center is now
connected but the elementary school will be tied in soon.
•
Chairman Murray
reminded everyone that the Authority only has two sources of income; the
quarterly sewer users fees and a monthly support payment from the Township of
$1,500. Because of this, the budget
must be watched very closely. He
further explained that is why further I & I work and the filamentous
bacteria growth inhibitor project must be postponed for now.
•
A map showing Phase 1 and Phase 2 of the
Ridge Road Extension Project was discussed.
It was noted that this map shows the new house numbers.
•
Dr. Patel asked
about his request to wait to connect his property until Phase 2 of the Ridge
Road Extension Project. Ms. Forndran
explained the status of the minor Act 537 Plan revision. Mr. Kelly said there was no way anyone could
make a recommendation to Dr. Patel until the Act 537 Plan revision for this
area is completed.
ADJOURNMENT:
The meeting was adjourned at 9:10 p.m.
Respectfully submitted,
Sabina J. Taylor, Secretary