PLANNING COMMISSION
The
Planning Commission of Chadds Ford Township met in the Township Hall on
Upon
motion and second (Todd, Reiter), the minutes of the
No
comments were offered.
Donald
T. Petrosa, Esquire, presented for Calvary Chapel, the equitable owner of Lots
2 and 4 of the Chadds Ford Plaza Subdivision.
Calvary Chapel is interested in building a church, but cannot submit a
conditional use application until Township ordinances are amended. Mr. Petrosa proposed a zoning ordinance
amendment to enable the church to submit a land development application at some
point in the future. The proposed amend
would allow for educational, philanthropic and religious uses by conditional
use in the POC and PBC areas.
Presentation had been made before the Board of Supervisors in September
and the Township Secretary had been authorized to advertise. The applicant had already received approval
from Delaware County Planning. Mr.
Petrosa asked re Planning Commission members for comments.
Mr.
Todd asked how broadly the term “philanthropic use” was being interpreted. Mr. Reiter also questioned “educational
use.” Mr. Petrosa suggested that
definitions are contained within present Township ordinances, but typical not
for profit organizations would most likely fall within the term.
Mr.
Reiter asked for specific information as to the location of the lot and Mr.
Petrosa provided same.
MOTION TO RECOMMEND
APPROVAL OF ORDINANCE 102 – AMENDMENT OF POC AND PBC
Upon
motion and second (Todd, Reamer), the Planning Commission unanimously
recommended that the Board of Supervisors adopt Ordinance 102, amending Chapter XII, Zoning, by amending Section 62,
PBC by amending
Planning Commission Minutes
Page
Two
section 12.62(b)(3)
Conditional Uses by adding a new subsection 12.62(b)(3)(vii) providing for
educational, philanthropic and religious uses; and by amending Section 63, POC,
by amending section 12.63(b)(3) Conditional Uses, and by adding a new
subsection 12.63(b)(3)(ii) providing for educational, philanthropic and
religious uses.
Michael
Lyons, Esquire was present for the applicant and reported that a meeting had
been held at the offices of Kelly Engineers regarding access to the proposed
church. Peter Goldring, PE, responded to
Kelly Engineers’ review letter dated
Comments 1. through 42. have been
resolved. Discussion centered on
comments 43. through 49, concerning stormwater
calculations, catchment areas, peak outflow values, routing information
theoretical hydraulic limits, downstream conditions and an additional
culvert. Mr. Todd questioned the
condition of the entrance roadway during a 50 year storm. Mr. Goldring responded that he did not
anticipate any water on the roadway and that an additional culvert will keep
the roadway dry even during a 100 year storm.
Mr.
Matson questioned whether the area that had been delineated on the plan clearly
indicated the size of the area in question and also questioned the hydraulic
capacity of the three culverts. If the
culverts need to be resized, the hydraulics of the calculations need to be revisited.
Specific designated areas might also produce additional flow into Harvey
Run. In stormwater calculations, what
happens downstream is of great importance with the question of ponding a
potential problem. A Manning’s analysis
would demonstrate if adequate capacity exists.
Mr. Matson agreed with the applicant’s basic concept, but asked for
additional calculations to support same.
Mr. Goldring responded that no flooding of the roadway will occur with
the current proposal.
Commission
members reviewed outstanding issues. Mr.
Taylor questioned Kelly’s comment 29., regarding
Operation and Maintenance agreement requirements. Mr. Goldring responded that the applicant
will comply with the requirement and also stated that in compliance with
comments 31. and 37., additional information will be
submitted to the Delaware County Conservation
District. Mr. Todd
asked for more information regarding foundations for the proposed crosses, see
Kelly comment 33.
Mr. Taylor asked Mr. Matson
if he would be satisfied with the application if Mr. Goldring provides the
additional calculations for comments 43. through
49. Mr. Matson replied that he would be
satisfied. Mr. Lyons asked if the
Commission would grant conditional approval so that he can proceed to make
application to the Township for a special exception.
Planning
Commission Minutes
Page
Three
MOTION TO RECOMMEND CONDITIONAL APPROVAL – NEW
Upon motion and second (Todd, Reamer), the Planning
Commission recommended approval of the
preliminary/final land development plan of New Horizons Fellowship Church,
conditioned upon final approval by the Township Engineer specifically as to any
and all outstanding issues as contained in the review letter of Kelly Engineers
dated October 29, 2003. Commission
members further recommended that applicant proceed with its application for
special exception.
James
E. Fritsch, PE, of Regester Associates, presented on behalf of applicant Thomas
Gakis, a
Mr.
Reiter stated that he recalled the lot having a steep grade down to Route 1,
most likely presenting a problem for access.
Mr. Fritsch replied that access is not that bad, with regrading to take
place and some shaving back of the bank to insure adequate sight lines. Mr. Taylor stated that the Camerons had at
one time submitted plans for a Sizzler Restaurant, with access coming from
Mr.
Todd questioned the impact of the Township’s plan to extend
Mr.
Fritsch asked Planning Commission members to consider recommending a rezoning
of the entire parcel. Mr. Taylor asked
if the applicant plans to apply to the Board of Supervisors for a zoning
change. Mr. Fritsch replied yes, but
that the applicant would prefer to have the Planning Commission’s endorsement
of such a change prior to making an application. Planning Commission members reviewed the
zoning map as it pertains to the area in question. After much discussion among members, Mr.
Taylor responded that Commission members were not in favor of recommending a
change of present zoning in that area.
Planning
Commission Minutes
Page
Four
Mr.
Fritsch proceeded to review parking requirements and the possibility of shared
spaces between the light Industrial and business portions, with the question
being whether the zoning line restricts the number of parking spaces. There was discussion as to whether the issue
was really a zoning question or something Planning Commission can
consider. Mr. Todd suggested that if
there are no legal issues involved and parking can be considered a site
question, Commission members could make recommendations to provide for the best
plan flow, etc. However, since there may
be legal issues that need to be determined, Planning Commission would not feel
comfortable recommending anything prior to that determination.
Mr.
Fritsch suggested that access from Route 1 is the only option available at this
point, unless Planning Commission objects to the approach. Mr. Taylor asked the depth of the paved
shoulder along Route 1 and the beginning of the parking lot. Mr. Fritsch answered about 77 feet and that
he might add a deceleration lane to the plan.
Mr. Taylor didn’t like the looks of the entrance considering with the
speed of traffic on Route 1. He stated
that everything possible needed to be done in order to insure as much safety as
possible. Mr. Taylor suggested Mr.
Fritsch attending Planning Commission workshop to review any updates.
L.
U. Ginter was present as agent for applicants Joseph and Carol Grace, as well
as John Wetzel of McCarthy Engineers.
Mr. Ginter had been at the October workshop and had further reviewed Mr.
Kelly’s comments as presented in the review letter.
Mr.
Ginter plans to submit a Planning Module Exemption request as suggested in
Comment 7. There had been questions as
to Kelly’s comment 16. regarding differing soil types. Mr. Wetzel responded to the question.
Kelly
Engineers will perform percolation testing for the sewage system for the
proposed house. Same is scheduled for
November 4th and 5th.
Comments from the Delaware County Conservation District had been
addressed and a resubmission will be made.
Mr.
Ginter stated that a letter had been sent by Mrs. Furlong regarding the
adequacy of the copy of the Deed that had been submitted with the application. Mr. Wetzel explained that in 1979, a 10 acre
parcel had been purchased by Joe Grace.
Another portion of land had been added when the High Ridge development
had been built. The acreage apparently
did not add up and the applicant submitted a sketch of the parcels in question
to explain the situation.
Planning
Commission Minutes
Page
Five
Mr.
Ginter asked Planning Commission members to recommend
approval of the plan. There was
discussion regarding the fact that revised plans had not been submitted. Mr. Mattson stated that he would be reluctant
to make a recommendation since revised plans had not been reviewed. Mr. Todd concurred that even though
requirements seem to have been met, a revised plan needed to be submitted to the
Township at least two week prior to the Planning Commission meeting. Mrs. Furlong asked that thirteen sets of
revised plans be submitted for distribution.
Mr.
Bandergee of
Mr.
Reamer questioned what Planning Commission would do if a resident does not agree with the provisions of a
proposed development. Mr. Taylor replied
that Planning Commission members will listen to all good arguments. Mr. Cutrona suggested Mr. Bandergee review
the provisions of his deed as to ownership of the road.
There being no further
business, the meeting was adjourned at
Respectfully submitted,
MARYANN D. FURLONG
Planning Commission Secretary